Work Breakdown

Decompose your main task in sub-task

· team,to-sort

Generate a list of tasks based on the SMART objectives agreed to by the team.

Initiate
Requirements
Scope
Critical Success Factors
Contract


Design
System Design
Concept
Detailed Design
WBS
Project Plan
Risk Management


Perform

  • Module 1
  • Develop Module 1
  • Documentation

 

  • Unit Test
  • Infrastructure
  • Test Plan
  • Perform Tests

 

  • Integration
  • Integration Test
  • System Build

  • Finalization
    System Test
    Verification
    Validation
    Tutorial


Closer
Installation
Logistics
Hand Over

You can see that the larger task was broken into many phases, and each phase was further broken down into sub-tasks.

Sometimes, this breakdown is done graphically using a Work Breakdown Schedule (WBS).